Lesotho's white gold: the political ecology of temporality and the economy of anticipation in resource extraction and large dam infrastructural projects

Yvonne Braun

Abstract


The construction phases of large dam and infrastructural projects often extend over long periods of time, creating social, environmental, cultural, political, and economic consequences in the proximate communities and landscapes. The temporality of the phases of the project – from planning to construction to post-construction – reveal more layered and wide-ranging consequences from the social and environmental changes that result, sharpened by greater attention to how these changes unfold across multiple timescales and sites of the project. Using the case study of the Lesotho Highlands Water Project (LHWP), I draw on a political ecology approach that uses longitudinal data, including interviews, document analysis, and ethnographic fieldwork conducted in Lesotho since 1997, to illustrate how active project narratives draw from and promulgate an affective economy of anticipation in ways that aim to both sustain the hope of people affected by the project and contain their criticism of the project amidst a continued investment by the state in the expansion of the LHWP. As people directly affected experience disjunctures between the promises and the realities of the project over time, subsequent phases of the project are simultaneously renewed and recast through a logic of improvement that emphasizes changes in the implementation of the project while continuing to invest in the future imaginary of development that requires going forward with project plans. A logic of continuity and improvement structures this continued commitment to the capital intensive LHWP through the strategic mobilization of phases that scaffold both the material and physical dimensions of the project, but also the affective and anticipatory hopes of prosperity that the project represents. In this case, it also reveals how project authorities weave these dimensions – the material and the aspirational – into specific planned changes and improvements to address previous and ongoing concerns as projects progress over time. This longitudinal approach demonstrates the importance of temporal and affective dimensions to our understanding of the complex, multi-faceted consequences of resource extractive mega-dam projects such as the LHWP, particularly as they further rationalize the resource extractive approach to economic development in the region.

Keywords: development, dams, infrastructure, political ecology, temporality, affect, resource extraction, economy of anticipation, displacement, construction, Lesotho, Southern Africa


Full Text:

PDF

References


Barradas, S. 2018. Lesotho Highlands Water Project – Phase II, Lesotho and South Africa. Engineering News [accessed September 7 2019]. http://www.engineeringnews.co.za/print-version/lesotho-highlands-water-project-phase-ii-lesotho-and-south-africa-2018-07-20

Bennett, M. 2006. Lesotho's export textiles & garment industry. In H. Jauch and R. Traub-Merz (eds.). The future of the textile and clothing industry in Sub-Saharan Africa. Bonn: Friedrich-Ebert-Stiftung.

Boelens, R., J. Hoogesteger, E. Swyngedouw, J. Vos and P. Wester. 2016. Hydrosocial territories: a political ecology perspective. Water International 41(1): 1-14.

Bond, P. (ed.). 2002. Lesotho's water, Johannesburg's thirst: communities, consumers, and mega-damsIn Bond, P. Unsustainable South Africa: environment, development and social protest. Durban: University of KwaZulu-Natal Press.

Bond, P. and M.M. Ndlovu. 2010. Development dilemmas of mega-project electricity and water consumption. In B. Freund and H. Witt (eds.). Development dilemmas in South Africa. Durban: University of KwaZulu-Natal Press.

Borgias, S.L. and Y.A. Braun. 2017. From dams to democracy: framing processes and political opportunities in Chile's Patagonia Without Dams movement. Interface: a Journal for and About Social Movements 9(2): 300-328.

Braun, Y.A. 2005a. Selling the river: gendered experiences of resource extraction and development in Lesotho. Research in Rural Sociology and Development 10: 373-96.

Braun, Y.A. 2005b. Resettlement and risk: women's community work in Lesotho. Advances in Gender Research 9: 29-60.

Braun, Y.A. 2006. Large dams as development: restructuring access to natural resources in Lesotho. In A.K. Jorgenson and E.L. Kick (eds.). Globalization and the environment. Leiden: Brill.

Braun, Y.A. 2008. 'How can I stay silent?': one woman's struggles for environmental justice in Lesotho. Journal of International Women's Studies 10(1): 5-20.

Braun, Y.A. 2011a. Left high and dry: an intersectional analysis of gender, dams, and development in Lesotho. International Feminist Journal of Politics 13(2): 141-162.

Braun, Y.A. 2011b. The reproduction of inequality: race, class, gender and the social organization of work at the site of large-scale development projects. Social Problems 58(2): 281-303.

Braun, Y.A. 2015. Interrogating large-scale development and inequality: bridging feminist political ecology, intersectionality and environmental justice frameworks. In S. Buechler and A.S. Hanson (eds.). A political ecology of women, water and global environmental change. London: Routledge. Pp. 19-37.

Braun, Y.A. and L.A. McLees. 2012. Space, ownership and inequality: economic development and tourism in the highlands of Lesotho. Cambridge Journal of Regions, Economy and Society 5(3): 435-449.

Braun, Y.A. and M.C. Dreiling. 2014. Frames, boomerangs, and global assemblages: border distortions in the global resistance to dam building in Lesotho. In N.A. Naples and J.B. Mendez (eds.). Border politics: social movements, collective identities, and globalization. New York: New York University Press.

Bromber, K., J. Féaux de la Croix, and K. Lange. 2014. The temporal politics of big dams in Africa, the Middle East, and Asia: by way of an introduction. Water History 6(4): 289-296.

Buechler, S. and A. Hanson (eds.). 2015. A political ecology of women, water and global environmental change. London: Routledge.

Central Intelligence Agency (CIA). 2010. CIA World Factbook: Lesotho. Washington, DC: Central Intelligence Agency (CIA).

Cross, J. 2015. The economy of anticipation: hope, infrastructure, and economic zones in South India. Comparative Studies of South Asia, Africa and the Middle East 35(3): 424-437.

Davidsen, P. A. 2006. The making and unmaking of the politics of exceptionality: studying processes of securitisation and desecuritisation in the Orange and Okavango River basins. Masters thesis. University of Bergen.

Dreiling, M.C. and D. Darves. 2011. Corporate unity in American trade policy: a network analysis of corporate-dyad political action. American Journal of Sociology 116 (5): 1514-1563.

Epprecht, M. 2000. 'This matter of women is getting very bad': gender, development and politics in colonial Lesotho. Pietermaritzburg: University of Natal Press.

Ferguson, J. 1990. The anti-politics machine: development, depoliticization, and bureaucratic power in Lesotho. Minneapolis: Minnesota University Press.

Fontein, J. 2008. The power of water: landscape, water and the state in Southern and Eastern Africa: an introduction. Journal of Southern African Studies 34(4): 737-756.

Gellert, P. and B. Lynch. 2003. Mega-projects as displacements. International Social Science Journal 55(1): 15-25.

Global Policy Network. 2006. Country Report – Lesotho. [accessed January 13 2011.] http://www.gpn.org

Harvey, D. 2006. Spaces of global capitalism: towards a theory of uneven geographical development. London: Verso.

Hassan, F.M.A. 2002. Lesotho – development in a challenging environment: a joint World Bank-African Development Bank evaluation. Washington, DC: African Development Bank and World Bank.

Hussain, M. 2008. Interrogating development: state, displacement, and popular resistance in North East India. New Delhi: Sage.

Infrastructure News. 2012. Masupha Sole back as water adviser. [accessed September 7 2019]. https://infrastructurenews.co.za/2012/11/06/masupha-sole-back-as-water-adviser

Infrastructure News. 2016. Despite delays, Lesotho water project to be completed by 2025. [accessed September 7 2019]. https://infrastructurenews.co.za/2016/10/31/despite-delays-lesotho-water-project-to-be-completed-by-2025

Jenkins, J. 2016. Contested terrain of extractive development in the American West: using a regional political ecology framework to understand scalar governance, biocentric values, and anthropocentric values. Journal of Political Ecology 23(1): 182-196.

Kenworthy, N. 2017. Mistreated: the political consequences of the fight against AIDS in Lesotho. Nashville: Vanderbilt University Press.

Khagram, S. 2004. Dams and development: transnational struggles for water and power. Ithaca: Cornell University Press.

Kirchherr, J. and K.J. Charles. 2016. The social impacts of dams: a new framework for scholarly analysis. Environmental Impact Assessment Review 60: 99-114.

Lesotho Highlands Development Authority (LHDA). 1986. Extraordinary LHDA order of 1986. Maseru, Lesotho: Lesotho Government Gazette.

Letsie, D. and P. Bond. 2010. Debating supply and demand characteristics of bulk infrastructure: Lesotho-Johannesburg water transfer. Background Research Series, Municipal Services Project.

Li, T.M. 2007. The will to improve: governmentality, development, and the practice of politics. Durham: Duke University Press.

Matli, M. 2004. The social impacts of a large development project: Lesotho Highlands Water Project. Master's Thesis. Bloemfontein, South Africa: University of the Free State.

Mitchell, T. 2002. Rule of experts: Egypt, techno-politics, modernity. Berkeley: University of California Press.

Molle, F., P.P. Mollinga and P. Wester. 2009. Hydraulic bureaucracies and the hydraulic mission: flows of water, flows of power. Water Alternatives 2(3): 328â€349.

Mosse, D. 2004. Is good policy unimplementable? reflections on the ethnography of aid policy and practice. Development and Change 35(4): 639-671.

Mosse, D. 2005. Cultivating development: an ethnography of aid policy and practice. London: Pluto.

Murray, C. 1981. Families divided: the impact of migrant labour in Lesotho. Cambridge: Cambridge University Press.

Panel of Environmental Experts (POE). 1991. Report to LHDA and the World Bank. Maseru, Lesotho: Lesotho Highlands Development Authority.

Peet, R. and M.J. Watts (eds.). 2004. Liberation ecologies. London: Routledge.

Perreault, T. 2013. Dispossession by accumulation? mining, water and the nature of enclosure on the Bolivian Altiplano. Antipode 45(5): 1050–1069.

Pottinger, L. 1996. Police kill striking dam workers in Lesotho. World Rivers Review 11(4): 3-6.

Purcell, M. 2008. Recapturing democracy: neoliberalization and the struggle for alternative urban futures. London: Routledge.

Rousselin, M. 2018. A study in dispossession: the political ecology of phosphate in Tunisia. Journal of Political Ecology 23(1): 20-39.

Roy, A. 2000. The algebra of infinite justice. New Delhi: Penguin.

Scudder, T. 2006. The future of large dams: dealing with social, environmental, institutional and political costs. London: Earthscan.

Scudder, T. 2012. Resettlement outcomes of large dams. In C. Tortajada, D. Altinbilek and A.K. Biswas (eds.). Impacts of large dams: a global assessment. Berlin, Heidelberg: Springer.

Sechaba Consultants. 1994. Poverty in Lesotho 1994: a mapping exercise. Working Document. Maseru, Lesotho: Government of Lesotho.

Smith, N. 2008. Uneven development: nature, capital and the production of space. Athens: University of Georgia Press.

Thamae, M.L. and L. Pottinger (eds.). 2006. On the wrong side of development: lessons learned from the Lesotho Highlands Water Project. Maseru: Transformation Resource Centre.

Tilt, B., Y.A. Braun and H. Daming. 2009. Social impacts of large dam projects: a comparison of international case studies and implications for best practice. Journal of Environmental Management 90: S249-S257.

Tshabalala, M. and S.D. Turner. 1989. 1988 Socio-economic census of the Lesotho Highlands Water Project phase 1A areas. Volume I, Main Report. Maseru, Lesotho: LHDA.

United Nations Lesotho. 2007. United Nations development assistance framework 2008-2012. Maseru: United Nations.

Weszkalnys, G. 2014. Anticipating oil: the temporal politics of a disaster yet to come. The Sociological Review 62(S1): 211–235.

World Bank. 2010. Project performance assessment report: Lesotho Highlands Water Project, phase 1B (Loan 4339-LSO) Community Development Support Project (Credit 3308-LSO). Washington, DC: World Bank.

World Commission on Dams (WCD). 2000. Dams and development: a new framework for decision-making: the report of the World Commission on Dams. London: Earthscan.




DOI: http://dx.doi.org/10.2458/v27i1.23250

Copyright (c) 2020 Yvonne Braun

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.